當(dāng)前位置:首頁(yè) > 新聞中心火災(zāi)自動(dòng)報(bào)警系統(tǒng)之消防控制室內(nèi)消防設(shè)備篇

火災(zāi)自動(dòng)報(bào)警系統(tǒng)之消防控制室內(nèi)消防設(shè)備篇

來(lái)源:http://n3462.cn/ 日期:2023-08-12

問(wèn)題描述
Problem Description
消防控制室內(nèi)消防設(shè)備布置及安裝不符合規(guī)范要求。
The layout and installation of fire equipment in the fire control room do not meet the requirements of the specifications.
2.規(guī)范要求
2. Specification requirements
《火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范》(GB 50116-2013)有關(guān)規(guī)定:
The relevant provisions of the Code for Design of Automatic Fire Alarm Systems (GB 50116-2013):
3.4.8消防控制室內(nèi)設(shè)備的布置應(yīng)符合下列規(guī)定:
3.4.8 The layout of equipment in the fire control room should comply with the following regulations:
1設(shè)備面盤前的操作距離,,單列布置時(shí)不應(yīng)小于1.5m,;雙列布置時(shí)不應(yīng)小于2m。
The operating distance in front of the equipment panel should not be less than 1.5m when arranged in a single row; When arranged in double rows, it should not be less than 2m.
2在值班人員經(jīng)常工作的一面,,設(shè)備面盤墻的距離不應(yīng)小于3m,。
On the side where the duty personnel frequently work, the distance between the equipment panel and the wall should not be less than 3m.
3設(shè)備面盤后的維修距離不宜小于1m,。
The maintenance distance behind the 3 equipment panel should not be less than 1m.
4設(shè)備面盤的排列長(zhǎng)度大于4m時(shí),其兩端應(yīng)設(shè)置寬度不小于1m的通道,。
When the arrangement length of the 4 equipment panels is greater than 4m, channels with a width of no less than 1m should be set at both ends.
5與建筑其他弱電系統(tǒng)合用的消防控制室內(nèi),,消防設(shè)備應(yīng)集中設(shè)置,并應(yīng)與其他設(shè)備間有明顯間隔,。
5. In the fire control room that is used in conjunction with other weak current systems in the building, fire equipment should be centrally installed and clearly separated from other equipment.
川消
6.1.3火災(zāi)報(bào)警控制器和消防聯(lián)動(dòng)控制器安裝在墻上時(shí),,其主顯示屏高度宜為1.5m~1.8m,其靠近門軸的側(cè)面距墻不應(yīng)小于0.5m,,正面操作距離不應(yīng)小于1.2m,。
When installing the fire alarm controller and fire linkage controller on the wall, the height of the main display screen should be between 1.5m and 1.8m, and the distance from the side near the door axis to the wall should not be less than 0.5m, and the front operating distance should not be less than 1.2m.
《火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收標(biāo)準(zhǔn)》(GB 50166-2019)有關(guān)規(guī)定:
The relevant provisions of the "Construction and Acceptance Standards for Automatic Fire Alarm Systems" (GB 50166-2019):
3.3.1火災(zāi)報(bào)警控制器、消防聯(lián)動(dòng)控制器,、火災(zāi)顯示盤,、控制中心監(jiān)控設(shè)備、家用火災(zāi)報(bào)警控制器,、消防電話總機(jī),、可燃?xì)怏w報(bào)警控制器、電氣火災(zāi)監(jiān)控設(shè)備,、防火門監(jiān)控器,、消防設(shè)備電源監(jiān)控器、消防控制室圖形顯示裝置,、傳輸設(shè)備,、消防應(yīng)急廣播控制裝置等控制與顯示類設(shè)備的安裝應(yīng)符合下列規(guī)定:
3.3.1 The installation of control and display equipment such as fire alarm controllers, fire linkage controllers, fire display panels, control center monitoring equipment, household fire alarm controllers, fire telephone exchanges, combustible gas alarm controllers, electrical fire monitoring equipment, fire door monitors, fire equipment power monitors, fire control room graphic display devices, transmission equipment, and fire emergency broadcast control devices should comply with the following regulations:
1應(yīng)安裝牢固,不應(yīng)傾斜,;
1. It should be installed firmly and should not tilt;
2安裝在輕質(zhì)墻上時(shí),,應(yīng)采取加固措施;
When installed on lightweight walls, reinforcement measures should be taken;
3落地安裝時(shí),,其底邊宜高出地(樓)面100mm~200mm,。
When installing on the ground, the bottom edge should be 100mm~200mm higher than the ground (floor) surface.
應(yīng)對(duì)措施:
Response measures:
1)設(shè)計(jì)人員應(yīng)根據(jù)消防設(shè)備的布置規(guī)劃與建筑設(shè)計(jì)充分溝通,預(yù)留足夠的消防控制室面積,;
1) Designers should fully communicate with the architectural design profession based on the layout plan of fire equipment, and reserve sufficient fire control room area;
2)應(yīng)根據(jù)選用的產(chǎn)品按相關(guān)規(guī)范標(biāo)準(zhǔn)進(jìn)行二次深化設(shè)計(jì),,做出詳細(xì)、準(zhǔn)確的消防控制室設(shè)備布置大樣圖,,施工單位應(yīng)嚴(yán)格按照設(shè)計(jì)圖紙及規(guī)范施工,。
2) The secondary deepening design should be carried out according to the selected products and relevant specifications and standards, and detailed and accurate equipment layout drawings for the fire control room should be made. The construction unit should strictly follow the design drawings and specifications for construction.
上一篇:如何判斷滅火器的使用年限的方式?
下一篇:消防灑水噴頭的類型有哪些,?